 |
| Problem |
| Last minute design change. Additional streetlights needed. |
|
 |
| PLCL Solution |
| Asphalt cut-through, electrical conduit installed, asphalt repaired. |
|
 |
| Problem |
| Massive stream bed erosion at outfalls. Difficult access. |
|
 |
| PLCL Solution |
| Application of filter cloth and rip rap. County Inspection Approved. |
|
 |
| Problem |
| Large scale slope erosion at storm water pond. |
|
 |
| PLCL Solution |
| Erosion control blanket installation. County Inspection Approved. |
|